Load Shedding Details for  February 20, 2018
SHEDDING IN MUs. = 0.033 MUs.  
 
MAX. SHEDDING  = 201 MW AT 18:21HRS. (201 MW TPDDL LOAD AFFECTED DUE TO TRIPPING OF 220kV MANDOLA(400kV) - NARELA CKT.-I&II)  
PEAK LOAD MET = 3590 MW AT 10:12:52HRs.